What a mess...
They have drilled everywhere except where they should have around this bonanza hit...lol
Why not drill behind ACRC0003 (ie, rig drive forward)?
This gives us the dip and potential continuation in one drill...instead, they went and scissored the hit first?
What the?
For all we know, they are dilling parallel to the dip...AND WILL NOT HIT THE BONANZA ZONE!
They need to drill behind ACRC0003 first, then move 10m north and south with repeat holes...get the dip, get the strike...and then do a scissor or two IF THE DIP IS CONDUCIVE.
They have really made a mess of this follow up program in my view.
Interesting to note however the reference to the dolerite dykes...lol As I said in a previous post, the dolerites are driving the bonanza copper enrichment...follow the dolerites!
I have lost confidence in these guys now...they appear to be looking for rocks here, not mineralisation!
It is obvious where it is...and they can't find it?
Cheers!
- Forums
- ASX - By Stock
- SI6
- botswana drill program progress report
botswana drill program progress report , page-7
-
-
- There are more pages in this discussion • 42 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SI6 (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.368M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
21 | 58970177 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 29133128 | 17 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
18 | 57432177 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 26389458 | 16 |
0.003 | 8543338 | 6 |
0.004 | 1250000 | 1 |
0.005 | 5425000 | 2 |
0.006 | 6666666 | 1 |
Last trade - 16.12pm 04/10/2024 (20 minute delay) ? |
Featured News
SI6 (ASX) Chart |
Day chart unavailable