Another possibility, maybe the design brief issued to the engineers was incorrect, whoever did the design brief may be ultimately responsible, who knows?
Process is the critical aspect of the Lamp, you wouldn't go looking there imo for cost savings so I would be surprised if this has happened, money could be saved in less critical areas such as wall and roof cladding quality or siteworks.
Sorry for rambling on here, just thinking out loud.
- Forums
- ASX - By Stock
- brainwave phase 2
Another possibility, maybe the design brief issued to the...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
|
|||||
Last
$6.40 |
Change
0.000(0.00%) |
Mkt cap ! $5.982B |
Open | High | Low | Value | Volume |
$6.46 | $6.47 | $6.37 | $2.821M | 439.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
24 | 17154 | $6.40 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$6.41 | 1334 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
19 | 16882 | 6.400 |
15 | 16131 | 6.390 |
9 | 14007 | 6.380 |
13 | 39740 | 6.370 |
8 | 79655 | 6.360 |
Price($) | Vol. | No. |
---|---|---|
6.420 | 9138 | 17 |
6.430 | 21335 | 14 |
6.440 | 14432 | 11 |
6.450 | 17305 | 11 |
6.460 | 89799 | 6 |
Last trade - 10.28am 15/07/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |