THB 6.06% 3.5¢ thunderbird resources limited

breakout today, page-81

  1. 4,331 Posts.
    Hi Susie

    Below is a cut out from the last release, whats interesting if im reading correctly it seems that VOR could be extending more than the 2 RC holes with diamond drilling, 2 diamond holes in high grade were completed at the time of the release pointing to more RC holes being extended.

    `

    ******As a result of the positive indications from the
    initial and current drilling, the Company has
    expanded the planned RC drilling programme
    and fast tracked two diamond core drill rigs to
    site to test high order anomalies identified in
    the recent geophysical and geological
    mapping programmes. The rigs will also
    complete diamond tails on the RC holes that
    have ended in high grade copper
    mineralisation.
    Already diamond core extensions on
    KM0012RCD & KM0013RCD have
    intersected broad continuing copper
    mineralisation comprised of chalcocite and
    chalcopyrite beneath the currently assayed
    RC intervals to approximate depths of 150
    metres*********
 
watchlist Created with Sketch. Add THB (ASX) to my watchlist
(20min delay)
Last
3.5¢
Change
0.002(6.06%)
Mkt cap ! $6.281M
Open High Low Value Volume
3.3¢ 3.5¢ 3.3¢ $14.26K 419.8K

Buyers (Bids)

No. Vol. Price($)
2 109088 3.3¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 108643 4
View Market Depth
Last trade - 14.25pm 09/07/2024 (20 minute delay) ?
THB (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.