Perhaps bbloff made a typo, and meant weeks not months.
As I understand it, the new pump will start running this week, flow for 6 weeks from now, takes it to the first week of Jan.
But what concerns me, is that apparently flow through this one fracture zone will not be enough for a future 50mw power station. It appears they need a few parallel zones, stacked and for the flow to pass roughly evenly through all of them, and in my mind that has to be demonstrated before this project is a goer. In order to achieve that, they need to fracture multiple zones (possible but not yet achieved), and drill through multiple zones (possible but challenging). This is was they refer to as MFS multiple fracture stimulation, and MFD multiple fracture drilling.
- Forums
- ASX - By Stock
- RNE
- brisbane agm
brisbane agm, page-8
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RNE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
-0.001(16.7%) |
Mkt cap ! $3.630M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.4¢ | $7.91K | 1.582M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
27 | 17347433 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 4849364 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
27 | 17347433 | 0.004 |
16 | 5726691 | 0.003 |
10 | 4816586 | 0.002 |
3 | 3300004 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 4849364 | 8 |
0.007 | 2540520 | 4 |
0.008 | 1244395 | 4 |
0.009 | 1709176 | 2 |
0.010 | 6159432 | 3 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
FWD
Queensland's housing crisis an opportunity for ASX builder Fleetwood – and taxpayer cash a safe harbour from the storm
SKS
SKS Technologies wins US$90M award to supply power to international hyperscale data centre in Melbourne
RNE (ASX) Chart |