RNE 16.7% 0.5¢ renu energy limited

brisbane agm, page-8

  1. 286 Posts.
    Perhaps bbloff made a typo, and meant weeks not months.

    As I understand it, the new pump will start running this week, flow for 6 weeks from now, takes it to the first week of Jan.

    But what concerns me, is that apparently flow through this one fracture zone will not be enough for a future 50mw power station. It appears they need a few parallel zones, stacked and for the flow to pass roughly evenly through all of them, and in my mind that has to be demonstrated before this project is a goer. In order to achieve that, they need to fracture multiple zones (possible but not yet achieved), and drill through multiple zones (possible but challenging). This is was they refer to as MFS multiple fracture stimulation, and MFD multiple fracture drilling.
 
watchlist Created with Sketch. Add RNE (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
-0.001(16.7%)
Mkt cap ! $3.630M
Open High Low Value Volume
0.5¢ 0.5¢ 0.4¢ $7.91K 1.582M

Buyers (Bids)

No. Vol. Price($)
27 17347433 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 4849364 8
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
RNE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.