I have raised the q. earlier of possible wider interpretation of the current production from the 10'zone, to interpolate the size of connecting (possible Humungous) larger interval.
It has been suggested that current testing of FP1, including gas analysis, can give an indication of the size of the main reservoir.
Can you or anyone cast any light, or a link, on how this is done? ie is it a mechanical test, or perhaps gas composition which is used ? Is it possible at all?
I know it may be highly technical and possibly too much to absorb or understand in detail, speaking personally of course, but a simple guide would be handy.
VIL Price at posting:
2.1¢ Sentiment: None Disclosure: Held