AZZ 0.00% $7.50 antares energy limited

Fraccing will depend on the level of preparation by the...

  1. 1,637 Posts.
    lightbulb Created with Sketch. 56
    Fraccing will depend on the level of preparation by the operator. We all expected fraccing might be necessary so the operator should have been ready . If the equipment isn't handy it could be weeks ,not days. I'm hoping they really did expect to have to frac, and if so, we could get a result within days.Let's all hope so!
 
watchlist Created with Sketch. Add AZZ (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.