EMS 3.45% 2.8¢ eastern metals limited

Browns Reef Drilling, page-4

  1. 997 Posts.
    lightbulb Created with Sketch. 112
    HAPPY BIRTHDAY
    23/05/2022 9:52am AEST Diamond DrillingRecommences at Browns ReefThe current drillingprogram consists of four holes designed to step out from the Evergreen Zone.
    These new holes,BRD014-015 and-BRD020-021, range in length from 300m to 350m with a totallength of 1,325m. Rotary mud collars will be drilled followed by diamonddrilling
    • A follow updiamond drilling program, aimed at extending the Evergreen Discovery Zone atBrowns Reef, has commenced
    • The four hole(1,325m) program, to extend the Evergreen Zone along strike to both the north and south, commencedfollowing the receipt of all necessary approvals
    • The first holewith a target length of 300m (BRD020) commenced on Saturday 21 May
    • The Program isexpected to take approximately four weeks to complete
    • Eastern Metals’ initial drilling program atBrowns Reef was completed in March 2022 with the discovery of the EvergreenZone1
 
watchlist Created with Sketch. Add EMS (ASX) to my watchlist
(20min delay)
Last
2.8¢
Change
-0.001(3.45%)
Mkt cap ! $2.767M
Open High Low Value Volume
2.9¢ 2.9¢ 2.8¢ $11.90K 421.6K

Buyers (Bids)

No. Vol. Price($)
1 200000 2.8¢
 

Sellers (Offers)

Price($) Vol. No.
2.9¢ 80000 1
View Market Depth
Last trade - 10.05am 11/07/2024 (20 minute delay) ?
EMS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.