If the HX/FBR blocklaying system proves to be consistently accurate over a period of time, the construction industry might gain enough confidence to do away with site measures and just rely on the dimensions shown on the drawings.
There might be the occasional mistake with some re-work needed, but the cost of this would be covered by greater savings across the board.
This might occur in one of two ways. Either individual trades start taking on the risks themselves and do away with site measures, or builders/head contractors direct their subcontractors to price jobs without an allowance for a site measure and indemnify them against errors. In the latter case, the builder can pool the risk of a mistake and offset the cost of one or two errors with the savings he achieves from all the other trades.
- Forums
- ASX - By Stock
- FBR
- Build 1 is close
Build 1 is close, page-252
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.3¢ |
Change
-0.001(2.27%) |
Mkt cap ! $207.4M |
Open | High | Low | Value | Volume |
4.5¢ | 4.5¢ | 4.2¢ | $164.8K | 3.774M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 1959402 | 4.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.3¢ | 1199999 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 1667783 | 0.042 |
10 | 1073951 | 0.041 |
11 | 691725 | 0.040 |
9 | 302240 | 0.039 |
4 | 1231578 | 0.038 |
Price($) | Vol. | No. |
---|---|---|
0.043 | 1199999 | 4 |
0.044 | 1100000 | 3 |
0.045 | 1136809 | 8 |
0.046 | 917410 | 3 |
0.047 | 105239 | 3 |
Last trade - 16.10pm 16/10/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online