not going to happen with KML anytimne soon. they are content with the Geraldton port which can handle their future near term growth. think i read somewhere that they can possibly ship up to 12mtpa through berth 7 if pushed i think. either way Michael Weir said that at this point they are not looking at anything other than berth 7.(that was in a phone call to me a week and a bit ago)