Start of investigations?
I was under the impression they were planning a power station and that :
"although significant additional field test
work was required, the deposit was ”likely to support a UCG operation with output to sustain a
power station in the range of 120MW to 1200MW”."
I don't know a whole lot about the UCG or the investigation process and I understand that additional tests need to be done, but am I misreading the tone of this announcement - is it a work of spin?
I can't understand why they would look as far afield as this if they didn't think it was an exceptional prospect.
Start of investigations?I was under the impression they were...
Add to My Watchlist
What is My Watchlist?