Announcement on 14 Feb advised that bulk sampling had commenced at Eureka with crushing, processing and analysis of the samples run in parallel with the mining. Initial results were expected from the first ore parcels by late February 2007. The overall mining program is scheduled for completion by the end
of March 2007.
I expect we may see preliminary results once a minimum level of ore has been processed (management is conservative as we know). Hopefully this will be within the next one to two weeks.
If the grade is +10g/t, GDR will be significantly re-rated.
GDR
goldstar resources nl
bulk sampling results on the radar
Add to My Watchlist
What is My Watchlist?