The gantry has two reasons for being installed: obviously as part of the possible solution to transport war production, but also down the track to transport Al Measher wells 1 & 2 production from block 7.
- Forums
- ASX - By Stock
- PSA
- Bull Elephant Candle through 200 day MA
Bull Elephant Candle through 200 day MA, page-77
-
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)