ASN 0.00% 13.0¢ anson resources limited

Bull project possible at all????, page-19

  1. 30,295 Posts.
    lightbulb Created with Sketch. 1825
    I have it on very good advise that at a very minimum it is 5 years before any mining for PGE's could take place on the Julimar project.

    That was my hunch too. Thanks for confirming. It's my assessment that it's going to take a lot of remediation for the environmental assessment and plans as well.

    However, if nickel takes off to the moon, that may change the equation and speed up the project. Economic drivers can be huge in this space.
 
watchlist Created with Sketch. Add ASN (ASX) to my watchlist
(20min delay)
Last
13.0¢
Change
0.000(0.00%)
Mkt cap ! $167.7M
Open High Low Value Volume
12.5¢ 13.0¢ 12.5¢ $27.78K 217.3K

Buyers (Bids)

No. Vol. Price($)
13 364989 12.5¢
 

Sellers (Offers)

Price($) Vol. No.
13.0¢ 501491 11
View Market Depth
Last trade - 13.12pm 04/07/2024 (20 minute delay) ?
ASN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.