I have it on very good advise that at a very minimum it is 5 years before any mining for PGE's could take place on the Julimar project.
That was my hunch too. Thanks for confirming. It's my assessment that it's going to take a lot of remediation for the environmental assessment and plans as well.
However, if nickel takes off to the moon, that may change the equation and speed up the project. Economic drivers can be huge in this space.
- Forums
- ASX - By Stock
- Bull project possible at all????
I have it on very good advise that at a very minimum it is 5...
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $124.0M |
Open | High | Low | Value | Volume |
9.7¢ | 9.8¢ | 9.5¢ | $104.6K | 1.088M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 160415 | 9.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.8¢ | 30000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 160415 | 0.096 |
8 | 542468 | 0.095 |
4 | 183258 | 0.094 |
4 | 132969 | 0.093 |
5 | 137669 | 0.092 |
Price($) | Vol. | No. |
---|---|---|
0.098 | 30000 | 1 |
0.099 | 159671 | 3 |
0.100 | 90007 | 1 |
0.105 | 455201 | 6 |
0.110 | 235132 | 5 |
Last trade - 16.10pm 21/08/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |
The Watchlist
CC9
CHARIOT CORPORATION LTD
MD - Shanthar Pathmanathan, Geologist - David Trabert
MD - Shanthar Pathmanathan
Geologist - David Trabert
SPONSORED BY The Market Online