The Company advises that activity on Jumonville #1 well has resumed drilling operations to test the Bullseye prospect. The Key #88 rig has been moved in over the last several days. Prior to suspending operations a 5 ½” drilling liner was set to 12,050ft TVD. Since re-entering the well bore, the cement plugs have been drilled out. A successful formation integrity test in excess of required mud weight expected in the reservoir sections of our objectives has been established. Currently, the well is drilling ahead. The projected total depth of the well is estimated at 12,550ft TVD which will test a secondary objective in the Camerina (~12,100ft TVD) and the primary objective in the Miogyp (~12,350ft TVD). The 500ft of final borehole is expected to be completed in 2-3 days, at which point open hole logs will be run. As part of the formation evaluation it is expected that a 3 ½” liner will be run to TD in order to obtain fluid samples from each objective for confirmation of electric log interpretations. Partners in the Jumonville #1 well* are: Golden Gate Petroleum Ltd (ASX code: GGP) 43.33% WI Modena Resources Limited (ASX code: MDA) 15.00% WI Pantheon Resources PLC 15.00% WI Eastern Advisors 20.00% WI Nuenco NL (ASX code: NEO) 6.67% WI * Working Interests are reflected prior to back-in rights of project vendor. On behalf of the Board of Directors For further information contact: Steve Graves Managing Director Phone +1 805 469 4656 Jeff Copley VP Operations Phone +1 713 334 0986 Golden
NEO Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.