According to prospectus "5–7 drill rigs on site with the strategy to double the Ore Reserve (from ~600Koz to ~1.2Moz) (100% basis) through 100,000 metres of additional drilling."
If they achieve it will be trading @ 0.38x P/NAV
Company is expected to commence production in Q2 2022.
- Forums
- ASX - By Stock
- Buy Buy Buy
According to prospectus "5–7 drill rigs on site with the...
-
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TUL (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online