CHK 0.00% 0.3¢ cohiba minerals limited

In addition we progressed the second phase of drilling program...

  1. 237 Posts.
    lightbulb Created with Sketch. 7
    In addition we progressed the second phase of drilling program at Oak Dam in June 2019 half after identifying a potential new iron oxide< copper,gold(IOCG) mineralised system 65 kilometres to the south east of BHP operations at Olympic Dam is South Australia.The results are currently being analysed and an update will be provided once finalised later in the year. ,,,,from the last paragraph on page 17 report.
 
watchlist Created with Sketch. Add CHK (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $10.76M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
9 21787599 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 18817379 23
View Market Depth
Last trade - 16.12pm 26/04/2024 (20 minute delay) ?
Last
0.3¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
0.3¢ 0.3¢ 0.3¢ 2275950
Last updated 15.09pm 26/04/2024 ?
CHK (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.