CHK 0.00% 0.5¢ cohiba minerals limited

In addition we progressed the second phase of drilling program...

  1. 237 Posts.
    lightbulb Created with Sketch. 7
    In addition we progressed the second phase of drilling program at Oak Dam in June 2019 half after identifying a potential new iron oxide< copper,gold(IOCG) mineralised system 65 kilometres to the south east of BHP operations at Olympic Dam is South Australia.The results are currently being analysed and an update will be provided once finalised later in the year. ,,,,from the last paragraph on page 17 report.
 
watchlist Created with Sketch. Add CHK (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.