STB 0.00% 40.0¢ south boulder mines ltd

oscar, ESS2 is not late- it will be reporting in this Quarter....

  1. asf
    9,887 Posts.
    oscar, ESS2 is not late- it will be reporting in this Quarter. From the last Quarterly:

    "During the Quarter, South Boulder Mines Ltd (“South Boulder” or “The Company” ASX: STB) continued to progress key technical studies and work required to complete an updated Engineering Scoping Study (ESS-2) on the Colluli Potash Project in Eritrea (as outlined in the June Quarterly Report). The objective of ESS-2 is to examine the potential to incorporate both Carnallite and Kainite potash mineralisation into the mining and processing plan at any early stage and, if warranted, to include any relevant information in the current DFS.
    Initial results from ESS-2 have been promising and a draft interim report was received subsequent to the end of the Quarter. Management is currently reviewing the final results with a view to reporting highlights from ESS-2 in the December 2012 Quarter."


 
watchlist Created with Sketch. Add STB (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.