FBR 2.33% 4.4¢ fbr ltd

Regarding your architect's comments that sites on estates...

  1. 350 Posts.
    lightbulb Created with Sketch. 249
    Regarding your architect's comments that sites on estates are built on at various and random stages only occurs if the lots aren't pre-purchased and/or pre-designed. A principal contractor may choose to stagger the development if it is a massive estate but generally the schedule is as follows:
    1. Earthworks
    2. Roadworks (Ret Walls are generally done at some point between 1 & 2)
    3. Stormwater
    4. Water Reticulation & Sewer
    5. Landscaping
    6. Construction

    Also keep in mind that there will be (in theory) multiple Hadrian's working on lots during stage 6. From the videos we have seen on the Hadrian, as long as Stages 1-4 are done and the slab is down, they can operate. I imagine that FBR work with the principal contractor (GP Vivienda) or EPCM who will ensure that X number of slabs are down on the lots before the Hadrian's are mobilized.

    Hope this helps.
 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
(20min delay)
Last
4.4¢
Change
0.001(2.33%)
Mkt cap ! $212.2M
Open High Low Value Volume
4.2¢ 4.5¢ 4.2¢ $153.5K 3.529M

Buyers (Bids)

No. Vol. Price($)
2 171217 4.4¢
 

Sellers (Offers)

Price($) Vol. No.
4.5¢ 1093065 5
View Market Depth
Last trade - 16.10pm 15/10/2024 (20 minute delay) ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.