when I spoke with Mark and Mike they both commented that they want a 1 metre width block and their working towards that, the bigger the block the faster the build.
Not just on the laying motion but the movement of bricks through the telehandler.
it's my understanding the The boom in HX 110 will be capable of 1 metre bricks.
Their will always be an issue with dust in the machine and speed of the saw it wouldn't surprise me if they removed the saw and use that space to store precut bricks
Their is also talk of the land developers (big mexico or cookie cutter estates) standadising the house size so no brick cuts are required.
ie house size of 200 sqm or 220 sqm.
- Forums
- ASX - By Stock
- FBR
- Byford Commercial Build Update
Byford Commercial Build Update, page-466
-
- There are more pages in this discussion • 323 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.4¢ |
Change
0.001(2.33%) |
Mkt cap ! $210.7M |
Open | High | Low | Value | Volume |
4.4¢ | 4.5¢ | 4.3¢ | $361.2K | 8.191M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 2272093 | 4.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.4¢ | 1559834 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 2272093 | 0.043 |
2 | 3365000 | 0.042 |
7 | 1546464 | 0.041 |
9 | 1297583 | 0.040 |
5 | 2499640 | 0.039 |
Price($) | Vol. | No. |
---|---|---|
0.044 | 1559834 | 1 |
0.045 | 596250 | 5 |
0.046 | 301000 | 4 |
0.047 | 913386 | 7 |
0.048 | 1689335 | 6 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online