FBR 2.33% 4.4¢ fbr ltd

when I spoke with Mark and Mike they both commented that they...

  1. 228 Posts.
    lightbulb Created with Sketch. 187
    when I spoke with Mark and Mike they both commented that they want a 1 metre width block and their working towards that, the bigger the block the faster the build.
    Not just on the laying motion but the movement of bricks through the telehandler.

    it's my understanding the The boom in HX 110 will be capable of 1 metre bricks.

    Their will always be an issue with dust in the machine and speed of the saw it wouldn't surprise me if they removed the saw and use that space to store precut bricks
    Their is also talk of the land developers (big mexico or cookie cutter estates) standadising the house size so no brick cuts are required.
    ie house size of 200 sqm or 220 sqm.




 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
(20min delay)
Last
4.4¢
Change
0.001(2.33%)
Mkt cap ! $210.7M
Open High Low Value Volume
4.4¢ 4.5¢ 4.3¢ $361.2K 8.191M

Buyers (Bids)

No. Vol. Price($)
4 2272093 4.3¢
 

Sellers (Offers)

Price($) Vol. No.
4.4¢ 1559834 1
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.