I think it'll depends on how the brick manufacturer manage it. and how they come to an arrangement into how the bricks are "packaged" to be delivered. It is an interesting idea, as at the brick manufacturing point a lot can be done in terms of pre-packaged. We know for a fact, that what ever FBR has done they have software to calculate which, what bricks gets laid 1st, this can be fed straight to the brick manufacturer before build, and a BLocks package can be manufactured out the back. Doing stuff at the factory level is a lot easier. Also, you save time cutting them within the HX and space/storage. Technically, with pre-loaded blocks, it'll be zero waste.
- Forums
- ASX - By Stock
- FBR
- Byford Commercial Build Update
Byford Commercial Build Update, page-468
-
- There are more pages in this discussion • 321 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.4¢ |
Change
0.001(2.33%) |
Mkt cap ! $210.7M |
Open | High | Low | Value | Volume |
4.4¢ | 4.5¢ | 4.3¢ | $361.2K | 8.191M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 2272093 | 4.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.4¢ | 1559834 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 2272093 | 0.043 |
2 | 3365000 | 0.042 |
7 | 1546464 | 0.041 |
9 | 1297583 | 0.040 |
5 | 2499640 | 0.039 |
Price($) | Vol. | No. |
---|---|---|
0.044 | 1559834 | 1 |
0.045 | 596250 | 5 |
0.046 | 301000 | 4 |
0.047 | 913386 | 7 |
0.048 | 1689335 | 6 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online