But that's going to be hard for HX find out at the back of the truck which block has the right position where grove was cut in, if you look at HWGA's zoom in photo, the groves seem to be customised to each block, according to HX control calculation I assume.
A lot of cutting noise in the video too, seems HX is cutting on each block laid, to be confirmed.
I think they will come up with a revoluionary design change to the bricks to improve speed in the future.
- Forums
- ASX - By Stock
- FBR
- Byford Commercial Build Update
Byford Commercial Build Update, page-81
-
-
- There are more pages in this discussion • 708 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.4¢ |
Change
0.001(2.33%) |
Mkt cap ! $210.7M |
Open | High | Low | Value | Volume |
4.4¢ | 4.5¢ | 4.3¢ | $361.2K | 8.191M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 2272093 | 4.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.4¢ | 1559834 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 2272093 | 0.043 |
2 | 3365000 | 0.042 |
7 | 1546464 | 0.041 |
9 | 1297583 | 0.040 |
5 | 2499640 | 0.039 |
Price($) | Vol. | No. |
---|---|---|
0.044 | 1559834 | 1 |
0.045 | 596250 | 5 |
0.046 | 301000 | 4 |
0.047 | 913386 | 7 |
0.048 | 1689335 | 6 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online