Any flows from this section will be a bonus IMO, more importantly the info gained from testing all the previously untested sections in this field will be invaluable in Atzam 5 and any further drilling.
Can anyone comment on the permeability in C16A & B?
It seems to be a massive variation for 36 feet of play....also would there be a fair amount of pressure sitting underneath C16 because of the gas on to of C17?
Surely after the testing of C16 and C13/14 combined with the lower sections on pump and gas separator we can achieve the required +200 bopd??
But maybe not before running out of money!! unless the directors have flown over and picked up the tools to get it done cheaper.
Looks to me they will be counting on flows to get some oppies converted to keep Range happy and not have to go cap in hand again.
Long way to go before I see some green
Oooohhh goto go trading halt!!
GLTA
- Forums
- ASX - By Stock
- ETR
- c16 carbonates
c16 carbonates
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ETR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ETR (ASX) Chart |
Day chart unavailable