Would this be right?
(excuse the terminology just getting the hang of this)
Ore contains 13.2 % zinc.
60kt ore mined per month.
= 0.132 x 60,000
= 7,920 tonnes zinc mined
Extract 91 % of the zinc.
= 0.91 x 7,920
= 7,207 tonnes of zinc extracted per month
Zinc price 2500 USD (I'm rounding against their premium)
Cost to port 558 USD.
= (2,500 - 558) x 7,207
= $13,995,994 per month zinc shipped ($14 mill per month)
$14m x 12
= $168m earnings per year <-- !!!
$168m x 8
= $1.3b total value extracted
CAPEX $136m
= $1.3b - $136m
= $1.16b value extracted over 8 years
- Forums
- ASX - By Stock
- AIM
- calcs based on review
calcs based on review
-
- There are more pages in this discussion • 36 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AIM (ASX) to my watchlist
(20min delay)
|
|||||
Last
77.0¢ |
Change
-0.010(1.28%) |
Mkt cap ! $160.2M |
Open | High | Low | Value | Volume |
78.5¢ | 78.5¢ | 73.5¢ | $115.2K | 151.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 78.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
75.0¢ | 1284 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 0.780 |
1 | 67232 | 0.770 |
1 | 19000 | 0.735 |
1 | 1371 | 0.730 |
1 | 5000 | 0.725 |
Price($) | Vol. | No. |
---|---|---|
0.750 | 1284 | 1 |
0.775 | 3595 | 2 |
0.780 | 3000 | 1 |
0.785 | 10014 | 1 |
0.790 | 52000 | 2 |
Last trade - 15.25pm 16/10/2024 (20 minute delay) ? |
Featured News
AIM (ASX) Chart |