"Testing of the well will be progressed in at least two stages commencing with a selection of sandstone reservoirs with conventional gas production potential lower in the well. Once sufficient data has been captured from the first test, a removable bridge plug will be set to isolate the lower test zone and a second test will be conducted over a shallower, thicker package of sands. Overall the flow testing program is expected to take approximately two months to complete."
Page 8 PCL half yearly report
- Forums
- ASX - By Stock
- California Resources to spud Tulainyo probe
"Testing of the well will be progressed in at least two stages...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PCL (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.8¢ |
Change
0.003(12.0%) |
Mkt cap ! $225.8M |
Open | High | Low | Value | Volume |
2.6¢ | 2.8¢ | 2.6¢ | $1.373M | 51.39M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 3697583 | 2.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.8¢ | 2763094 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 2009337 | 0.029 |
13 | 2677939 | 0.028 |
13 | 4674494 | 0.027 |
13 | 2641429 | 0.026 |
10 | 3167509 | 0.025 |
Price($) | Vol. | No. |
---|---|---|
0.027 | 100000 | 1 |
0.028 | 2445951 | 12 |
0.029 | 10755597 | 12 |
0.030 | 4100375 | 13 |
0.031 | 1832250 | 4 |
Last trade - 16.10pm 23/04/2024 (20 minute delay) ? |
|
|||||
Last
2.8¢ |
  |
Change
0.003 ( 14.3 %) |
|||
Open | High | Low | Volume | ||
2.6¢ | 2.8¢ | 2.6¢ | 22606028 | ||
Last updated 15.59pm 23/04/2024 ? |
Featured News
PCL (ASX) Chart |