Is it correct that the drill stem test for heron 2 was only conducted over 15 metres and this was for the elang sands flowing at 6 mcfd? So the top plover has never been tested which according to the farm out docs seemed to also indicate wet gas
MEO Price at posting:
17.0¢ Sentiment: Hold Disclosure: Held