A JORC is a long way off and would require some intensive in-fill drilling. The next step would be to release a "target statement", but I can't see Wah Nam doing that.
There is certainly nothing that comes remotely close to the 135m+ high grade strike for the first hole at Opthalmia.
In BRM's AGM back in 2009, they summarised the "better results" for Marillana as follows:
25m @ 59.2% Fe in MRC040 27m @ 58.8% Fe in MRC041 29m @ 58.2% Fe in MRC053
... not quite the same as an intersection of 135.45m grading 61.02% Fe recorded in first drill hole that ended in open mineralisation!
BRM Price at posting:
$2.14 Sentiment: Hold Disclosure: Held