I thought that SDL may be being held back because there was no port infrastructure in place close enough to Lolabe to be capable of gettingt rail and port infrastructure equipment to site, when I asked Giulio, he said it would not be a problem getting the equipment needed to build the port and ,transported to Lolabe.
Regards
Westcott.
SDL Price at posting:
0.7¢ Sentiment: None Disclosure: Not Held