OAU 10.0% 0.6¢ ora gold limited

can anyone read it, page-2

  1. 12,454 Posts.
    lightbulb Created with Sketch. 265
    NICKEL AND PLATINUM EXPLORATION UPDATE
    The Directors of Thundelarra Exploration Ltd (“Thundelarra”) are
    pleased to announce further encouraging results from the resource
    definition drilling program currently underway at Copernicus
    located in the East Kimberley of Western Australia. The latest
    assays have returned significant intercepts from the holes drilled into
    the main mineralised pyroxenite including:
     14 metres @ 1.81% nickel and 0.97% copper from 218
    metres, and
     18 metres @ 1.05% nickel and 1.28% copper from 274
    metres.
    The results for the latest assayed holes are presented in the following
    table and hole locations on the attached Copernicus project plan.
    Hole No North East Dip From-To Int. Ni
    %
    Cu
    %
    Co
    %
    CORC070 103005 55300 90 NSR
    CORC071 103053 55298 90 218-232 14 1.81 0.97 0.06
    CORC072 103090 55300 90 234-245 11 0.76 0.77 0.03
    CORC073 103045 55273 90 NSR
    CORC074 103105 55248 90 274-292 18 1.05 1.28 0.04
    Drilling is continuing at Copernicus with two rigs now on site
    including a large machine capable of drilling to a vertical depth of
    500 metres.
    At the new Edison platinum discovery additional soil, rock and
    trench sampling is underway in preparation for a second drilling
    program scheduled to commence in September. This program will
    test approximately 2 kilometres of the interpreted Edison ultramafic
    stratigraphy. Drilling to date has only assessed 200 metres strike of
    the prospective unit and to a shallow depth.
    Preliminary interpretation of results from the Edison prospect
    indicates that the platinum+palladium+gold (3E) mineralisation
    occurs within a poorly exposed easterly dipping weathered ultramafic
    unit that is thickening to the south (see attached Location map and
    Drill Sections). Detailed petrological, geochemical and metallurgical
    studies are currently underway to determine the characteristics of the
    platinum minerals.
    ASX
    ANNOUNCEMENT
    4 September 2006
    Thundelarra Exploration
    Ltd
    ABN 74 950 465 654
    ACN 085 782 994
    For further information
    regarding Thundelarra
    Exploration Ltd contact:
    Philip Crabb
    Chairman
    or
    Brian Richardson
    Director of Exploration
    Phone: + 61 8 9321 9680
    Fax: + 61 8 9321 9670
    Website:
    www.thundelarra.com
    Email:
    [email protected]
    Registered Office:
    Suite 2, Level 3, IBM Building
    1060 Hay Street, West Perth
    Western Australia 6005
    PO Box 7363, Cloisters
    Square
    Perth Western Australia 6850
    Page 2
    In diamond drill hole LDH21 drilled in 1988 and located approximately 2 kilometres south west of the
    Edison discovery, petrological studies of core have shown that platinum mineralisation (13 metres @
    0.83 g/t 3E) occurs in a massive fresh serpentinised peridotite and associated with finely disseminated
    sulphides (pyrite, chalcopyrite, pyrrhotite, pentlandite) and cumulus chromite grains. The Edison
    mineralisation may have a similar association with disseminated sulphides
    Further work is now required to determine the significance of the Edison discovery and of a number
    of other nearby geochemical anomalies generated by Thundelarra’s recent extensive soil geochemical
    program. It is important to note that in addition to the significant 3E mineralisation discovered at
    Edison, the recent drilling completed by Thundelarra on the Lamboo project returned other
    encouraging results including 62 metres at 0.78g/t 3E from 51 metre depth in hole THXRC011 located
    1 kilometre north-west of Edison.
    The details contained in this report that pertains to ore and mineralisation is based upon information compiled by Mr Brian Richardson, a full-time
    employee of the Company. Mr Richardson is a Member of the Australasian Institute of Mining and Metallurgy (AUSIMM) and has sufficient experience
    which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a
    Competent Person as defined in the December 2004 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
    Reserves” (JORC Code). Mr Richardson consents to the inclusion in this report of the matters based upon his information in the form and context in
    which it appears.
    Kalgoorlie
    PERTH
    
    Copernicus Project
    MLA80/540
    2006 Exploration
    Author: B.Richardson
    Report No.:
    24m @ 2.46% Ni,1.16% Cu
    (including 18m @ 3.03% Ni)
    CORC064
    14m @ 1.54% Ni, 0.92% Cu CORC066
    11m @ 1.36% Ni, 0.85% Cu
    (including 4m @ 2.95% Ni, 1.09% Cu)
    CORC062
    3m @ 1.69% Ni 2.31% Cu
    CORC065
    3m @ 1.29% Ni 0.75% Cu
    CORC070
    CORC073
    2006 Drilling
    Pre 2006 Drilling
    MLA80/540
    CORC063
    CORC067
    CORC068
    CORCD060
    10m @ 1.02% Ni, 0.83% Cu
    (2005 Drilling)
    Open Pit Resource
    COPERNICUS JV
    THUNDELARRA - BREAKAWAY JV
    CORC071
    14m @ 1.81% Ni 0.97% Cu
    CORC072
    11m @ 0.76% Ni 0.77% Cu
    CORC074
    18m @ 1.05% Ni 1.28% Cu
    7957700 mN 7957700 mN
    7957900 mN 7957900 mN
    7958100 mN 7958100 mN
    323700 mE 323700 mE
    323500 mE 323500 mE
    Kalgoorlie
    PERTH
    
    Lamboo Project - Edison Prospect
    Significant Drill Results
    (On Magnetic Image)
    Author: B.Richardson
    Report No.:
    Projection: AMG Zone 52 AGD84
    Revised:
    Dwg No.: EKB1012
    Drawn: R.Ferguson
    Scale: 1: 2,500
    Date: 16 August 2006
    East Kimberley
    Project
    Location
    Map
    0 0.05 0.1
    Kilometers
    Scale: 1:2,500
    THXRC030
    THXRC023
    46m @ 1.87g/t Pt + Pd + Au
    from surface
    THXRC024
    23-42m - 19m @ 1.18g/t Pt + Pd + Au
    44-54m - 10m @ 1.13g/t Pt + Pd + Au
    THXRC025
    33m @ 2.77g/t Pt + Pd + Au
    from surface
    THXRC026
    37m @ 2.07g/t Pt + Pd + Au
    THXRC028
    1m @ 1.16g/t Pt + Pd + Au
    THXRC031
    4m @ 1.23g/t Pt + Pd + Au
    THXRC027
    5-20m - 15m @ 2.04g/t Pt + Pd + Au
    22-36m - 14m @ 1.46g/t Pt + Pd + Au
    THXRC029
    7-14m - 7m @ 1.48g/t Pt + Pd + Au
    17-20m - 3m @ 1.52g/t Pt + Pd + Au
    2006 Drilling with significant intercepts
    Drill Traces
    LAMBOO PROJECT - EDISON PROSPECT
    Section 11,200mN
    0
    Cover
    90m EOH
    100m EOH
    Arsenic Anomalous Contact
    Chlorite Schist
    Mineralised Ultramafic
    Chlorite Schist
    -500mRL
    -450mRL
    -425mRL
    -400mRL
    25
    METRES
    19m @ 1.18g/t Pt + Pd + Au
    10m @ 1.13g/t Pt + Pd + Au
    THXRC023 THXRC024
    46m @ 1.87g/t Pt + Pd + Au
    Surface
    Section 11,150mN
    9,000E 9,050E 9,100E
    Cover
    Cover Cover
    Mixed Amphibolite
    Chlorite Schist
    Chlorite Schist
    Mineralised Ultramafic
    100m EOH 100m EOH
    -500mRL
    -450mRL
    -425mRL
    -400mRL
    THXRC025 THXRC026
    Arsenic Anomalous Contact
    37m @ 2.07g/t Pt + Pd + Au
    33m @ 2.77g/t Pt + Pd + Au
    0 25
    METRES
    Surface
    9,000E 9,050E 9,100E
 
watchlist Created with Sketch. Add OAU (ASX) to my watchlist
(20min delay)
Last
0.6¢
Change
0.001(10.0%)
Mkt cap ! $39.27M
Open High Low Value Volume
0.6¢ 0.6¢ 0.6¢ $6 1K

Buyers (Bids)

No. Vol. Price($)
8 14595596 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 36434241 28
View Market Depth
Last trade - 15.16pm 05/09/2024 (20 minute delay) ?
OAU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.