“The current method of recovery, although slow, is considered substantially cheaper than the alternative of drilling around the lost pipe and the casing hanger, and re-drilling the well section between 9,150’ and 15,397’.”
Wouldn't a sidetrack and re-drilling the well definitely be the slower option unless something else has to be taken into account?
- Forums
- ASX - By Stock
- GDN
- can only assume
can only assume, page-47
Featured News
Add GDN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online