CVN 1.14% 21.8¢ carnarvon energy limited

news update

  1. 1,480 Posts.
    OPERATION UPDATE THAILAND –
    NS8-D1 APPRAISAL WELL SPUDDED;
    L44-H TESTING COMMENCED
    EXPLORATION PERMIT L44/43
    L-44H Appraisal Well
    Testing has commenced on appraisal well L44-H within the last 48 hours. Variable
    quantities of oil and drilling fluids have been recovered at the surface and the well is in
    the early stages of clean up. Once a stable rate has been achieved, results of the test will
    be released.
    The L-44H well is located approximately 3.25 kilometres north of the producing NS3-
    D1, in the central lobe of the Na Sanun East (“NSE”) oil field.
    NS8-D1 Appraisal Well
    NS8-D1 well has spudded and is currently drilling ahead at around 75m depth.
    NS8-D1 is a further appraisal/development of the southern Na Sanun East fault block in
    addition to the two successfully producing wells POE-9 and NS3-D1.
    The well is being drilled as a deviated well eastwards across the bounding fault into the
    Na Sanun East structure. NS8-D1 is around 600 metres north of the producing NS3-D1
    well.
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
(20min delay)
Last
21.8¢
Change
-0.003(1.14%)
Mkt cap ! $393.5M
Open High Low Value Volume
22.0¢ 22.0¢ 21.5¢ $325.1K 1.481M

Buyers (Bids)

No. Vol. Price($)
24 651240 21.5¢
 

Sellers (Offers)

Price($) Vol. No.
22.0¢ 554745 7
View Market Depth
Last trade - 11.08am 20/05/2024 (20 minute delay) ?
Last
21.5¢
  Change
-0.003 ( 1.15 %)
Open High Low Volume
22.0¢ 22.0¢ 21.5¢ 1310671
Last updated 11.17am 20/05/2024 ?
CVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.