CTP 3.92% 5.3¢ central petroleum limited

Mobilization of Hunt Rig 2 is poised to commence on 10th June...

  1. 354 Posts.
    Mobilization of Hunt Rig 2 is poised to commence on 10th June with the
    planned sequence of the Blamore 1 well followed by a Coal Bed Methane well
    (CBM) or two and then the Simpson 1 well in the Pedirka Basin. The Finke
    Desert Race due to start on June 6th and run for 3 days has effectively closed
    the road from Kulgera to the Simpson Desert. Time to complete mobilization is
    approximately 10-15 days on a trouble free basis. An updated Gant chart is
    attached.
    • The third water bore for road building purposes located at the Blamore 1 well
    site is being utilised but with some diminished flow rates until a deeper pump
    position for the permanent pump can be arranged later today or tomorrow.
    • A total of three CBM wells are also planned in the Pedirka. Blamore 1 and
    Simpson 1 oil wells are addressing up to 260 MMbbls of undiscovered oil
    initially in place (UOIIP) and the CBM wells will be the first in a series planned
    to flow test possible CBM recoverable resources of 34-70 TCFG in the Permian
    and Triassic coals known to be distributed through the Pedirka Basin by
    previous drilling and regional seismic.
    • Central is in Joint Venture with Rawson Resources Limited (RAW) and
    Petroleum Exploration Australia Limited (PXA) on Simpson 1 and with PXA on
    the CBM wells and Blamore 1.
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
0.002(3.92%)
Mkt cap ! $38.48M
Open High Low Value Volume
5.1¢ 5.3¢ 5.1¢ $21.48K 412.4K

Buyers (Bids)

No. Vol. Price($)
1 347358 5.3¢
 

Sellers (Offers)

Price($) Vol. No.
5.6¢ 102917 1
View Market Depth
Last trade - 15.59pm 26/06/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.