I see from the latest presentation MGO have quietly raised the estimated CAPEX development costs to $1.8 billion from $1.6 billion estimated in Dec 2011.
First production has also been pushed back to 2016 since the Dec 2011 presentation indicated production in 2015.
Add to My Watchlist
What is My Watchlist?