KAR 1.62% $1.57 karoon energy ltd

Not sure if the reduction is related to this advice in the last...

  1. 12,880 Posts.
    lightbulb Created with Sketch. 590
    Not sure if the reduction is related to this advice in the last qtrly. May is going to be bad, but at least planned.

    A full shut down of the FPSO for maintenance is now scheduled for May 2024 as part of Karoon and the FPSOoperator’s ongoing program to improve the reliability of the FPSO. Activities planned for the shutdowninclude inspection of tanks, valves and the hull of the FPSO, as well as further pipe inspections and integrityactivities. The shutdown is planned to be extended by up to a week beyond the original two week duration,to allow further maintenance work to take place, with a total shutdown period of up to three weeks.
 
watchlist Created with Sketch. Add KAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.