Not sure why you keep quoting the copper price when Caravel is not even in production, or even in the construction stage. The DFS is not even due till 2024, so the copper price is irrelevant. Even if it was, Caravel need to be above $4 to be turning a profit, so at current price Caravel would be running at a loss
- Forums
- ASX - By Stock
- CVV
- Caravel Copper Project - Bankable Feasibility Study
Caravel Copper Project - Bankable Feasibility Study, page-9
-
-
- There are more pages in this discussion • 219 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVV (ASX) to my watchlist
|
|||||
Last
15.5¢ |
Change
0.005(3.33%) |
Mkt cap ! $81.26M |
Open | High | Low | Value | Volume |
15.5¢ | 15.5¢ | 14.5¢ | $36.67K | 244.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 46702 | 14.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.5¢ | 44865 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 46702 | 0.145 |
8 | 170649 | 0.140 |
2 | 188888 | 0.135 |
6 | 68907 | 0.130 |
2 | 36500 | 0.120 |
Price($) | Vol. | No. |
---|---|---|
0.155 | 44865 | 1 |
0.160 | 19999 | 1 |
0.165 | 39231 | 2 |
0.170 | 64000 | 1 |
0.180 | 70910 | 4 |
Last trade - 16.10pm 09/08/2024 (20 minute delay) ? |
Featured News
CVV (ASX) Chart |