SYA 3.23% 3.0¢ sayona mining limited

Care and Maintenance on its way

  1. 2,679 Posts.
    lightbulb Created with Sketch. 673
    The spod price is at approximately $1700 per tonne.

    Our cost is approximately $1250 per tonne.

    After you factor in the $350 per tonne loss on 50% of our product to PLL the gap of profit v loss is narrowing very quickly.

    I'm not going to be surprised if we go into C & M in a few months.

    If this happens, it is good night PLL.
 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.