Can anyone advise the date in which the Carrapateena Decision is likely to be made?
Do not know.
What infrastructure is already in place at Carrapateena?
None
If Oz is the successful bidder, how long would it take for the mine to become operational?
Do not know. My guess would be up to 5 years.
What size deposit is Carrapateena in comparison with Prominent Hill? Cu grades?
No JORC. It has been extensively drilled with one drill hole returning 905m of 2.17% copper. I have done some modelling (very rough) and come up with avg copper of 2.16% and a copper resource in excess of 4mt.