RCR's assumption is that the Pearse Gold Project only has a mine life of 2.5 years. Pg 23 of the AGM slides (23Nov) does however touch on the exploration work to extend this resource. And I think Jim is confident of increasing the mine life of Pearse as well as discovering new sources of gold at Mineral Hill with the Horizon 3 targets of 50koz of gold/annum from this site alone.