RFE 0.00% 0.0¢ series 2018-1 reds trust

cash flow positive, page-6

  1. 4,837 Posts.
    Well #2-29 expected to peak at or above the field average 75mcfg = .075mmcfg/d At this rate it would take around 36 years per well to produce 1 BCF of gas, not including decline rates. Except the wells would probarbly cut out long before this.
    Envy , not on these numbers.
 
watchlist Created with Sketch. Add RFE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.