VIL 0.00% 1.6¢ verus investments limited

cash situation, page-6

  1. 5,003 Posts.
    lightbulb Created with Sketch. 11
    Everyone is presuming they are going to be plugging the bottom zone before moving up the well. I thought I read that the casing is 7 inches. If it is they can test upper zones and still run production tubing to the lower zone. On a 5 inch casing they need to plug.

    Anyway I do know it is in no ones interest to have this entire production infrastructure in place and for the well to be off-line for any length of time not absolutely needed to do the perforations and tests. Time is literally money with this well so I think it will all happen very fast when it does.
 
watchlist Created with Sketch. Add VIL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.