So having a look at what NZC are doing for their stage 1 operation. This can only be used as a guide as it's a different metal and location within the DRC. Certainly, don't base any financial transactions on this post.
Estimates are taken from their latest updated DFS
1. Stage 1 open pit mine and on-site 1Mtpa Dense Media Separation (DMS) processing plant to produce two high-quality dry saleable concentrate products suitable as a feedstock for off-site processing. In AVZ case this would be Tin and Lithium
2. Project construction is expected to be 12 months
3. Project capital approximately US$53.12 million - again this may be because of onsite infrastructure already inplace (power, water etc) so again only a guide.
If we don't like what is being put forward by potential JV suitors then we can say no thanks and start going it alone until they come to their senses.
Haplo
- Forums
- ASX - By Stock
- AVZ
- CATL’s IPO and reference to Manono
CATL’s IPO and reference to Manono, page-149
Featured News
Add AVZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online