So mushroom, in CY17 160kt of spod is forecasted to be produced as the plant is ramping up, but in CY18 (at full capacity of 1.6Mt p.a.) 200kt of spod will be produced. Is that correct?
Week 44 Wrap: Relatively boring week ahead of US election; HotCopper's most watched; Oz inflation at 3.5%
MKT The ASX can overlook its Telecomm small-caps. Here’s one diversified brand with an international footprint