CTP central petroleum limited

cbm93004 what can we expect?

  1. 801 Posts.
    For those "time poor" people.

    lets keep in mind that we were using a rig that many have said did not suite the purpose.Even with the problems the drill took roughly 2 weeks.

    here is a snapshot of what was released to the market
    1/2 dozen other announcements including BRR, good oil presentation etc... plus the drill reports below

    RE: CBM 93001
    26/8/08 CTP provided a drill program
    drilling 27/8 - 6/9 11 days

    29/8/08 advised spudded on 28th at 10pm
    1/9/08 280 meters
    2/9/08 705 meters
    3/9/08 background gas c.6 units(560ppm)max includ c 1-4
    4/9/08 prepare for drill stem test ( an unfortunate day)
    5/9/08 problems with the rig
    10/9/08 drill apparently fixed and first coals found
    "elevated gas readings up to 8 units"
    12/09/08 "very good preliminary indications or permeability" core showed "good cleating and some fractured elevated gas readings"

    15/9/08 981 meters. significant coal intersection. max gas recorded 132 units

    16/9/08 1008 meters "very strong blow" during dst of coal

    18/9/08 1218 meters 172units gas c1 - 5. mud weight increased to control water flow. coal appeared increase in richness (vitrinite/liptinite)

    19/9/08 well completed and suspended.

    disclosure: I hold CTP and CTPO only. I have a sizeable investment in each (for me)
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
5.4¢
Change
0.000(0.00%)
Mkt cap ! $40.24M
Open High Low Value Volume
5.4¢ 5.4¢ 5.2¢ $22.38K 420.5K

Buyers (Bids)

No. Vol. Price($)
1 380539 5.4¢
 

Sellers (Offers)

Price($) Vol. No.
5.5¢ 123906 1
View Market Depth
Last trade - 16.10pm 11/07/2025 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.