Thanks mate, thought I'd contribute a little
It sure does, well by the looks of it Nemaura submitted between the 21/12/18 and 31/12/18 and we submitted on the 02/01/19. So either this week or next, otherwise we should be requesting an update regarding reason for the delay. 60% would be very nice, 30% at an absolute minimum.
Not long now, soon we'll be drinking as much, say, 2013 Penfolds Grange as your heart desires
- Forums
- ASX - By Stock
- RAP
- CE submitted on Dec 30.
CE submitted on Dec 30., page-32
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)