JRV is not alone here.
GME is another stock that is still to get finance/partner for its proposed project.
Extracts from GME's Prefeasibility report:
PRE FEASIBILITY STUDY CONFIRMS MAJOR NEW NICKEL HEAP LEACH PROJECT
• Annual Production - 13,100 tonnes Nickel and 630 tonnes Cobalt
• Minimum Mine Life 20 years
• Operating Surplus - A$3.70 billion (pre tax)
• Operating Costs - US$2.49/lb (after Co credit)
• Capital Costs - A$455 million
• NPV - A$1.47 billion (pre tax )
• Strong Potential for Existing Resource Base to Support Higher Production
GME's share price is down also.
Regards
SP
- Forums
- ASX - By Stock
- JRV
- chairman of the bored
chairman of the bored, page-6
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add JRV (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
-0.001(6.67%) |
Mkt cap ! $37.83M |
Open | High | Low | Value | Volume |
1.6¢ | 1.6¢ | 1.4¢ | $47.50K | 3.167M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 2518000 | 1.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.5¢ | 502240 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
18 | 2518000 | 0.014 |
11 | 4182307 | 0.013 |
9 | 2623158 | 0.012 |
5 | 1409635 | 0.011 |
7 | 2898352 | 0.010 |
Price($) | Vol. | No. |
---|---|---|
0.015 | 150000 | 1 |
0.016 | 3851251 | 7 |
0.017 | 1559766 | 6 |
0.018 | 2861568 | 8 |
0.019 | 1605000 | 4 |
Last trade - 16.10pm 02/08/2024 (20 minute delay) ? |
Featured News
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
JRV (ASX) Chart |