Hey Phil
I heard something similar from people who worked on the wells, as a petroleum eng perhaps you can shed some light on some questions.
1. If wells are improperly fracced as I believe the CC wells were, what kind of damage is caused? I thought it would potentially be unable to isolate the productive reservoir hence why there is so much water and it also blocks the permability?
2. Can this be fixed, I also thought it was very hard to fix a stuffed frac job if at all possible depending on the damage.
3. The MAE although drilled form the same pad seem to not have long lateral drill lengths? With CBM and Shale wells I thought to get significant gas very long multiple laterals had to be drilled?
Add to My Watchlist
What is My Watchlist?