MGT magnetite mines limited.

Glad someone else is on the same page, you would be surprised at...

  1. 136 Posts.
    lightbulb Created with Sketch. 24
    Glad someone else is on the same page, you would be surprised at the amounts of tick the box awards, commencements etc that was ended up costing a bomb because a project was awarded 6 months prior to engineering and design being finalised.

    Here's hoping they are doing it locally (all of engineering, design and construction) and not doing it overseas as this would further give the market confidence of a quality product, and a see / touch product.

    People under estimate a design freeze on construction projects. A designer or engineer will continue tweaking and making changes for as long as they are allowed, regardless of the status of procurement or construction. Typically these roles are conducted on hourly rates therefore they will sit there doing the same for as long as they can purely to justify their existence.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
8.0¢
Change
0.002(2.56%)
Mkt cap ! $9.681M
Open High Low Value Volume
8.0¢ 8.2¢ 7.9¢ $21.75K 272.0K

Buyers (Bids)

No. Vol. Price($)
1 12258 7.9¢
 

Sellers (Offers)

Price($) Vol. No.
8.0¢ 1596 1
View Market Depth
Last trade - 15.47pm 27/06/2025 (20 minute delay) ?
MGT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.