I was there and watched them be installed I watched the drill core come in and I watched the complete mismanagement of the project from that point. Pay for fuel to power the plane but not the reagents, get some reagents rushed in only to have the fuel run out it was a circus staff not paid for months on end HR managers still hiring people like it was a fully funded ramp up total disaster people planning box cuts based on a failed drill programme just to keep a mining contractor working. I have never seen anything like it and I hope not to again however the gold was there and the plant is the right design also Riverina is a stand alone project seperate to all the other ground they have. Good management low debt and solid funding this thing has legs. Oh and Mr Czerw is a talented Geo and he hasn’t wasted the last decade chasing rainbows.
- Forums
- ASX - By Stock
- Chart Break and 40c target
I was there and watched them be installed I watched the drill...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OBM (ASX) to my watchlist
(20min delay)
|
|||||
Last
56.8¢ |
Change
0.003(0.44%) |
Mkt cap ! $1.052B |
Open | High | Low | Value | Volume |
58.0¢ | 58.0¢ | 56.0¢ | $1.462M | 2.545M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 80375 | 56.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
57.0¢ | 62935 | 22 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
16 | 84988 | 0.565 |
10 | 114347 | 0.560 |
8 | 238894 | 0.555 |
15 | 311449 | 0.550 |
8 | 97566 | 0.545 |
Price($) | Vol. | No. |
---|---|---|
0.570 | 54180 | 20 |
0.575 | 107680 | 11 |
0.580 | 504800 | 13 |
0.585 | 388230 | 14 |
0.590 | 240576 | 6 |
Last trade - 15.22pm 12/09/2024 (20 minute delay) ? |
Featured News
OBM (ASX) Chart |